All of Parod
Item 02Risks & controls
A risk register your auditors will want to read.
Structured scoring, living heat maps and a controls library with its own reviews, incidents and actions.
2.1Three-tier assessment
Where you are, where your controls take you, where you want to be.
Every risk is scored impact times likelihood, 1 to 5, at every tier.
Inherent risk
20The raw risk, before any controls.
Residual risk
8What remains with controls in place.
Target risk
4Where you want to be. Optional.
- One scale everywhere
- The same scoring in every register, so movement is evidence, not opinion.
- Living heat maps
- Inherent and residual positions on an interactive 5 × 5 map.
- Review discipline
- Each register sets how often its risks are reviewed. Overdue reviews are flagged.
- Access per register
- Sensitive registers stay with the people who should see them.
2.2The controls library
A controls library, not a column on the register.
Controls are records with owners, reviews, incidents and actions of their own.
- One control, many risks
- Change the control once and every linked risk sees it.
- Effectiveness, your way
- A single RAG rating, or design and operating effectiveness rated separately.
- Incidents feed back
- Record whether a control failed, mitigated, detected or was bypassed.
2.3Evidence
Everything is evidenced, and everything connects.
History is kept at the level of the field, and each risk stays tied to its meetings, objectives and metrics.
- Field-level audit trail
- Who, when, the field, and the old and new value. Append-only.
- Relationship graph
- See what else a risk touches, from controls and objectives to meetings.
- Reports on a schedule
- Risk change, heat map migration and review discipline, before the committee meets.
2.4Specification
The full specification.
Every feature, for the people doing the due diligence.
Scoring and registers7 features
- One scale
- Impact and likelihood are each scored 1 to 5 and multiplied, at every tier, in every register. Movement between tiers is evidence, not opinion.
- Multiple registers
- Strategic, operational, project or committee registers, each with its own owner, colour, review frequency and access list.
- Heat maps
- Inherent and residual positions on an interactive 5 × 5 map per register. Filter by category or owner and drill into the cell.
- Categories and causes
- Your own risk and control categories, and a library of standard causes alongside the organisation's own, so analysis is comparable across registers.
- Implications
- Record what the risk would mean if it crystallised, so the score is explained rather than asserted.
- Review discipline
- Each register sets how often its risks must be reviewed. Overdue reviews are flagged on the register, and reported on.
- Register-level access
- Who can view, edit or manage each register is set independently. Sensitive registers stay with the people who should see them.
Controls7 features
- One control, many risks
- Controls live in a central library and link to as many risks as they mitigate. Change the control once and every risk sees it.
- Effectiveness, your way
- Choose a single RAG rating per control, or a split model that rates design effectiveness and operating effectiveness separately. Set once for the organisation.
- Reviews with history
- Each control review is recorded with its rating, reviewer and notes, so the trend in effectiveness is visible.
- Control attributes
- Type, frequency, whether it is automated, the line of assurance it belongs to, and the owner responsible.
- Incidents
- Incidents are recorded against risks and linked to controls with a role: the control failed, mitigated, detected or was bypassed. That is the feedback loop into effectiveness.
- Remediation actions
- Actions can be raised directly on a control, so remediation sits with the thing being remediated.
- Controls and metrics
- A control can be linked to the performance metrics it supports, answering which controls stand behind an objective.
Evidence6 features
- Field-level audit trail
- Every change to a risk, control or action is logged with who, when, the field and the old and new value. Append-only.
- Soft delete and restore
- Deleted risks are not destroyed. Restore them with their full history intact.
- Relationship graph
- An interactive map of how risks, controls, objectives, metrics, incidents, actions and meetings connect, for the question “what else does this touch?”
- Linked to meetings
- Agenda items link to risks, so the board discusses the register in context and actions flow back to it.
- Linked to objectives and metrics
- Risks link to the objectives they threaten and the metrics they would move, so exposure can be reported by objective.
- Reports
- Risk change, risk activity, heat map migration, review discipline, objective exposure, and full register and controls exports. Scheduled or on demand.
One record
Connected to the rest of the record
Next step
Bring your register. We will load it.
Send us an export and we will set it up for the demonstration, controls and all.